{"links":{"self":"https://preview.epetitions.website/archived/petitions/21882.json"},"data":{"type":"archived-petition","id":21882,"parliament":{"period":"2010-2015","government":"Conservative – Liberal Democrat coalition","dissolution_at":"2015-03-30T23:59:59.000+01:00","response_threshold":10000,"debate_threshold":100000},"attributes":{"action":"Motorway Construction Procedure","background":null,"additional_details":"Petition for a change in the procedure in which motorway roadworks take place.\r\n\r\nThe current system leaves a vast expanse of unattended roadworks, leaving areas cordoned off without any plans for construction in the short term, possibly leaving them for weeks or months without use.\r\n\r\nThis petition suggests; the breaking down of roadworks into shorter segments to prevent the unnecessary congestion caused by the feeding of 3 lane traffic into 2 lanes, the ending of misallocation of speed cameras and the lowering of speed limits for the protection of an absent workforce.","committee_note":null,"state":"closed","signature_count":4,"created_at":"2011-11-07T12:30:26.000Z","updated_at":"2020-02-16T19:27:31.961Z","rejected_at":null,"opened_at":"2011-11-08T08:25:35.000Z","closed_at":"2012-11-08T08:25:35.000Z","moderation_threshold_reached_at":"2011-11-07T12:30:26.000Z","response_threshold_reached_at":null,"government_response_at":null,"debate_threshold_reached_at":null,"debate_scheduled_at":null,"scheduled_debate_date":null,"debate_outcome_at":null,"rejection":null,"government_response":null,"debate":null,"departments":[],"topics":[],"signatures_by_country":[],"signatures_by_constituency":[],"signatures_by_region":[],"other_parliamentary_business":[]}}}