Important:

This petition was submitted during the 2010-2015 parliament

Petition Extend the Metrolink to Bolton.

More details

Extend the Manchester Metrolink to Bolton via Kearsley and Farnworth..

This petition is closed This petition ran for 12 months

11 signatures

Show on a map the geographical breakdown of signatures by constituency

10,000 signatures required to get a government response