This petition was submitted during the 2010-2015 parliament
Petition Extend the Metrolink to Bolton.
More details
Extend the Manchester Metrolink to Bolton via Kearsley and Farnworth..
This petition is closed This petition ran for 12 months
11 signatures
Show on a map the geographical breakdown of signatures by constituency
10,000 signatures required to get a government response